Ramdan Hours:
Sun - Thu
9.30 AM - 2.30 PM
Iftar in --:--:--
🌙 Maghrib: --:--

Machine tools : (Record no. 10488)

MARC details
000 -LEADER
fixed length control field 07964cam a2200349 i 4500
001 - CONTROL NUMBER
control field 17956202
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210323120401.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 131127s2014 nyua 001 0 eng
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2013041552
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780071812221 (hardback)
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Language of cataloging eng
Transcribing agency DLC
Description conventions rda
Modifying agency DLC
042 ## - AUTHENTICATION CODE
Authentication code pcc
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TJ1185
Item number .G255 2014
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 621.902
Item number G.R.M
Edition number 23
084 ## - OTHER CLASSIFICATION NUMBER
Classification number TEC009070
Source of number bisacsh
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Gamblin, Russell.
245 10 - TITLE STATEMENT
Title Machine tools :
Remainder of title specification, purchase, and installation /
Statement of responsibility, etc Russell Gamblin.
264 #1 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc New York :
Name of publisher, distributor, etc McGraw-Hill Education,
Date of publication, distribution, etc [2014]
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 192 pages :
Other physical details illustrations ;
Dimensions 24 cm
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
500 ## - GENERAL NOTE
General note Includes index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note 1. Budget phase -- Attend one of the many quality international trade shows -- Develop a return on investment projection -- Prepare a payback projection for the project -- Develop a breakeven cost for the machine tool -- Develop the first specification of the machine tool -- Develop a list of technical differences between the proposed machine tool and the older machines in your factory -- Develop a list of suppliers -- Rate machine tool suppliers, their equipment, and their capabilities -- Visit machine tool manufacturers -- Gather "Ballpark" quotes from each machine tool manufacturer -- Develop an overall budget cost for the machine tool -- Develop a budget for the machine tool foundation -- Develop an electrical cost of the machine tool -- Develop a facility modification budget for the machine tool -- Develop a removal and demolition cost for the old machine tool and its foundation -- Develop a tooling cost for the new machine tool -- Final budget costs -- Create the overall project schedule -- Capital appropriation and level of authority -- Summary -- 2. Procurement -- Prespecification meeting -- Machine tool project specification document -- Selection of the project leader for the entire project except the foundation -- Machine tool supplier visits and quotes -- Machine tool supplier references -- The final approved machine tool specification -- Checklist for the project leader/manager during the procurement phase -- Operator training -- Maintenance and facilities training -- Application and programming training -- Schedule for the machine tool build -- Terms and conditions -- Liquidated damages due to late delivery -- Consequential damages -- Ordering the machine tool -- Visit the supplier's factory during the build process of your machine tool -- Acceptance of the machine tool at the supplier's facility -- Summary -- 3. Layout phase -- Layout during the procurement phase -- Maximize floor space -- General notes for layout of a horizontal boring machine -- Maximum weight of the largest piece of the machine tool -- Soil boring specification -- Minimum requirements for the machine tool location -- Develop the overall schedule of the foundation installation -- Planning the removal of the existing equipment -- Planning the demolition of the old foundation and/or floor slabs around the old machine tool -- Planning the removal of the old utilities (water, power, air, etc.) -- Floor plate layout and installation -- Summary -- 4. Foundation phase -- Prefoundation meeting and foundation project leader -- Schedule for the completed foundation -- Tricks of the trade (trench design and saving floor space) -- Bury the conduit and black iron pipe in the new foundation only -- Foundation pit modifications -- Develop a foundation design specification -- At least five review sessions for the foundation design -- Bid foundation design and purchase order for the foundation design -- Installation of the dust walls and limiting access during construction -- Purchase order for the demolition of the old foundation and installation of the new foundation -- Review and sign-off on the rebar drawings for the new foundation -- Prejob safety briefing prior to demolition and the installation of the new foundation -- Concrete cylinder test -- Foundation cure period -- General contractor specification -- Foundation summary -- 5. Installation phase -- Create the machine tool installation specification -- Installation of the machine tool without maintenance and facility support -- Machine tool installation bid—get at least three quotes -- Machine tool installation purchase order -- Purchase of the machine tool lubrication oils and coolant -- Epoxy painting of the nonshrink grout and concrete foundation -- Purchase and installation of the machine tool metal chip bin-- Purchase and installation of the grout cans, grout forms, and grout pour -- Purchase and installation of the safety rails of the machine tool -- Overall installation schedule -- General notes for installation of the machine tool -- Installation of the ladders and stairs to access the foundation pits -- Summary -- 6. Preparation phase -- Preparation phase -- Chip conveyor requirements when the chip conveyor is supplied by the OEM -- Chip conveyor requirements when the chip conveyor is not supplied by the OEM -- Chip deflectors for the chip conveyor and other sections of the machine tool -- Main power source for the machine tool -- Secondary power source for the machine tool -- Compressed air -- Water -- Chilled water -- Coolant/oil skimmers -- Coolant coalescer -- Coolant wall and enclosure -- Touching up the epoxy coating of the foundation -- Lighting in the foundation pits -- Isolation transformer -- DNC software -- Direct numerical control procedure -- PC at the machine tool for network connection -- Main 480-VAC breaker -- Deck plate, checkered plate, and bar grating around the machine tool covering the machine tool foundation pits -- Laser alignment checks -- Final machine tool acceptance -- Machining test -- Develop and test a part program -- Teleservice provided by the machine tool OEM and installed and tested by the machine tool buyer -- Warranty -- Conduit (EMT, IMC, Rigid, and PVC) required for the machine tool -- Power track or Wireway -- Head attachments (head house or no head house) -- Sag compensation -- Temperature compensation -- Checking of the hard and soft overtravel switches of the machine tool -- Basic reference of the machine tool -- Start-up of the machine tool from an off state -- Lock out and tag out procedures and disconnect for the machine tool -- Backup of all the CNC data -- Viewing of and access to the PLC ladder logic -- Summary -- 7. Start-up phase -- Start-up phase -- Machining test and test parts -- Acceptance tests -- Final machining test -- Continuous running test -- Uptime accountability of the machine tool -- Machine tool supplier support during the first year -- One-year meeting after final acceptance—lessons learned -- Documentation of the machine tool -- Summary -- 8. Maintenance phase -- Why perform maintenance? -- Decrease machining downtime by implementing a daily operational and preventive maintenance program -- Increase overall productivity of the machine tool -- Higher accuracy and quality of parts produced by checking your machine tool's alignments and laser calibration at least once per year -- Daily operations checklist -- Monthly maintenance checklist -- Semiannual maintenance checklist -- Annual maintenance checklist -- Standard spare parts list -- Long-term spare parts list -- Summary.
520 ## - SUMMARY, ETC.
Summary, etc "Invaluable, difficult to find information for the optimum purchase, design, and installation of large-scale, ultra-expensive machine tools, written by an engineer who has been "in the trenches," saving companies millions"--
Assigning source Provided by publisher.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Machine-tools.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element TECHNOLOGY & ENGINEERING / Mechanical.
Source of heading or term bisacsh
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 7
b cbc
c orignew
d 1
e ecip
f 20
g y-gencatlg
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Books
Holdings
Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Acquisition method Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
  Dewey Decimal Classification     Faculty of Engineering & Technology (General) Main library Main library B3 14/02/2016 Osiris Bookshop 1125.00 Purchase   621.902 G.R.M 00012604 19/02/2025 14/02/2016 Books