MARC details
| 000 -LEADER |
| fixed length control field |
04800cam a2200349 i 4500 |
| 001 - CONTROL NUMBER |
| control field |
17043557 |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20230528120019.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
111112s2012 ne a b 001 0 eng |
| 010 ## - LIBRARY OF CONGRESS CONTROL NUMBER |
| LC control number |
2011293798 |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
9781856179294 |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
DLC |
| Transcribing agency |
DLC |
| Description conventions |
rda |
| 050 00 - LIBRARY OF CONGRESS CALL NUMBER |
| Classification number |
TN871 |
| Item number |
.L287 2012 |
| 082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER |
| Edition number |
21 |
| Classification number |
622.3381 |
| Item number |
L.W.F |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Lyons, William C. |
| Relator term |
author |
| 245 10 - TITLE STATEMENT |
| Title |
Formulas and calculations for drilling, production, and workover : |
| Remainder of title |
all the formulas you need to solve drilling and production problems / |
| Statement of responsibility, etc |
William Lyons, Tom Carter, Norton J. Lapeyrouse. |
| 250 ## - EDITION STATEMENT |
| Edition statement |
3rd edition |
| 264 #1 - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) |
| Place of publication, distribution, etc |
Amsterdam ; |
| -- |
Boston : |
| Name of publisher, distributor, etc |
Elsevier/GPP, |
| Date of publication, distribution, etc |
[2012] |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
x, 293 pages : |
| Other physical details |
illustrations ; |
| Dimensions |
21 cm |
| 336 ## - CONTENT TYPE |
| Source |
rdacontent |
| Content type term |
text |
| 337 ## - MEDIA TYPE |
| Source |
rdamedia |
| Media type term |
unmediated |
| 338 ## - CARRIER TYPE |
| Source |
rdacarrier |
| Carrier type term |
volume |
| 500 ## - GENERAL NOTE |
| General note |
Rev. ed. of: Formulas and calculations for drilling, production, and workover / Norton J. Lapeyrouse. |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc |
Includes bibliographical references and index. |
| 505 0# - FORMATTED CONTENTS NOTE |
| Formatted contents note |
Chapter One. Basic Equations; 1.0. Terminology; 1.1. Mud Weight MW (lb/ft3), Mud Weight MW (ppg), and Specific Gravity (SG) [USCS/British]; 1.2. Density? (kg/m3 or kg/liter), Mud Weight MW (N/m3 or N/liter), and Specific Gravity (SG) [SI-Metric]; 1.3. Hydrostatic Pressure (P) and (p) [USCS/British]; 1.4. Hydrostatic Pressure (P) and (p) [SI-Metric]; 1.5. Pressure Gradient? (psi/ft), G (ppg) [USCS/British]; 1.6. Pressure Gradient G (SG) [SI-Metric]; 1.7. Equivalent Circulating "Density" ECD (ppg) [USCS/British]. 1.8. Equivalent Circulating "Density" ECD (N/liter) and ECD (SG) [SI-Metric]1.9. Mud Pump Output Q (bbl/stk) and q (gpm) [USCS/British]; 1.10. Capacity Formulas; 1.11. Annular Velocity Van (ft/min); 1.12. Strokes per Minute (SPM) Required for a Given Annular Velocity; 1.13. Control Drilling; 1.14. Buoyancy Factor (BF); 1.15. Decrease When Pulling Pipe Out of the Hole; 1.16. Loss of Overbalance Due to Falling Mud Level; 1.17. Circulating Hydraulic Horsepower (HHP); 1.18. Pump Pressure/Pump Stroke Relationship (the Roughneck's Formula); 1.19. Cost per Foot; 1.20. Temperature Conversion Formulas. Chapter Two. Basic Calculations2.0. Capacity, Volumes, and Strokes; 2.1. Slug Calculations; 2.2. Accumulator Capacity; 2.3. Bulk Density of Cuttings (Using Mud Balance); 2.4. Drill String Design (Limitations); 2.5. Ton-Mile (TM) Calculations; 2.6. Cementing Calculations; 2.7. Depth of a Washout; 2.8. Lost Returns--Loss of Overbalance; 2.9. Stuck Pipe Calculations; 2.10. Calculations Required for Placing Spotting Pills in an Open Hole Annulus; 2.11. Pressure Required to Break Circulation; Chapter Three. Drilling Fluids; 3.0. Mud Density Increase and Volume Change. 3.1. Mud Weight Reduction with Base Liquid Dilution3.2. Mixing Fluids of Different Densities; 3.3. Oil-Based Mud Calculations; 3.4. Solids Analysis; 3.5. Solids Fractions (Barite-Treated Muds); 3.6. Dilution of Mud System; 3.7. Evaluation of Hydrocyclones; 3.8. Evaluation of Centrifuge; Chapter Four. Pressure Control; 4.0. Normal Kill Sheet; 4.1. Calculations; 4.2. Kill Sheet with a Tapered String; 4.3. Kill Sheet for a Highly Deviated Well; 4.4. Prerecorded Information; 4.5. Kick Analysis; 4.6. Pressure Analysis; 4.7. Stripping/Snubbing Calculations; 4.8. Subsea Considerations. 4.9. Workover Operations4.10. Controlling Gas Migration; 4.11. Gas Lubrication; 4.12. Annular Stripping Procedures; 4.13. Worksheet; Chapter Five. Engineering Calculations; 5.0. Bit Nozzle Selection--Optimized Hydraulics; 5.1. Hydraulics Analysis; 5.2. Critical Annular Velocity and Critical Flow Rate; 5.3. The "d" Exponent; 5.4. Cuttings Slip Velocity; 5.5. Surge and Swab Pressures; 5.6. Equivalent Circulation Density (ECD); 5.7. Fracture Gradient Determination--Surface Applications; 5.8. Fracture Gradient Determination--Subsea Applications; 5.9. Directional Drilling Calculations. |
| 520 ## - SUMMARY, ETC. |
| Summary, etc |
A quick reference for day-to-day work out on the rig or a handy study guide for drilling and well control certification courses, Formulas and Calculations for Drilling, Production and Workover has served a generation of oilfield professionals throughout their careers. Compact and readable, Formulas and Calculations for Drilling, Production and Workover, 3rd Edition is a problem solving time saving tool for the most basic or complex predicaments encountered in the field. All formulas and calculations are presented in easy-to-use, step-by-step order, virtually all the mathematics required out on. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name as entry element |
Oil wells |
| General subdivision |
Management |
| -- |
Mathematics. |
| 9 (RLIN) |
28013 |
| 700 1# - ADDED ENTRY--PERSONAL NAME |
| Personal name |
Carter, Tom. |
| 9 (RLIN) |
28014 |
| Relator term |
author |
| 700 1# - ADDED ENTRY--PERSONAL NAME |
| Personal name |
Lapeyrouse, Norton J. |
| Relator term |
author |
| 700 1# - ADDED ENTRY--PERSONAL NAME |
| Personal name |
Lapeyrouse, Norton J. |
| Title of a work |
Formulas and calculations for drilling, production, and workover. |
| 9 (RLIN) |
28016 |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Koha item type |
Books |
| Source of classification or shelving scheme |
Dewey Decimal Classification |