Ramdan Hours:
Sun - Thu
9.30 AM - 2.30 PM
Iftar in --:--:--
🌙 Maghrib: --:--

Managing the construction process : (Record no. 9266)

MARC details
000 -LEADER
fixed length control field 05788cam a2200373 a 4500
001 - CONTROL NUMBER
control field 16302100
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20180726135228.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 100625s2012 maua b 001 0 eng
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2010026551
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780138135966 (alk. paper)
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0138135967 (alk. paper)
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Transcribing agency DLC
Modifying agency DLC
042 ## - AUTHENTICATION CODE
Authentication code pcc
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TH438
Item number .G68 2012
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 690
Edition number 22
Item number G.F.M
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Gould, Frederick E.,
Dates associated with a name 1954-
245 10 - TITLE STATEMENT
Title Managing the construction process :
Remainder of title estimating, scheduling, and project control /
Statement of responsibility, etc Frederick E. Gould.
250 ## - EDITION STATEMENT
Edition statement 4th ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Boston :
Name of publisher, distributor, etc Prentice Hall,
Date of publication, distribution, etc c2012.
264 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Boston :
Name of publisher, distributor, etc Prentice Hall,
Date of publication, distribution, etc c2012.
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 290 p. :
Other physical details ill. (some col.) ;
Dimensions 29 cm.
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
500 ## - GENERAL NOTE
General note engineering bookfair2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references and index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Machine generated contents note: SECTION ONE CONSTRUCTION PROJECT MANAGEMENT --<br/>ch. 1 Industry and The Project --<br/>Introduction --<br/>The Construction Industry --<br/>The Players --<br/>Future Outlook --<br/>The Construction Project --<br/>Categories of Construction Projects --<br/>The Project Team --<br/>Conclusion --<br/>ch. 2 The Project Management Process --<br/>Introduction --<br/>Project Chronology --<br/>Preconstruction --<br/>Procurement --<br/>Construction --<br/>Project Closeout --<br/>Conclusion --<br/>ch. 3 Construction Contracts and Delivery Methods --<br/>Introduction --<br/>Project Risk and Liability --<br/>Delivery Methods --<br/>Design-Bid-Build --<br/>Design-Build --<br/>Construction Project Management --<br/>Student Union Example --<br/>Contract Types --<br/>Single Fixed Price --<br/>Unit Price Contract --<br/>Cost Plus a Fee --<br/>Contract Changes --<br/>Student Union Example Continued --<br/>Conclusion --<br/>Section Two Estimating --<br/>ch. 4 Estimating Fundamentals --<br/>Introduction --<br/>Why Estimate? --<br/>Types of Estimates --<br/>Conceptual Phase Schematic Phase --<br/>Design Development Phase --<br/>Procurement Phase --<br/>Estimate Considerations --<br/>Project Size --<br/>Project Quality --<br/>Location --<br/>Time --<br/>Other Market Conditions --<br/>The Estimating Process --<br/>Conclusion --<br/>ch. 5 Conceptual and Square Foot Estimating --<br/>Introduction --<br/>Conceptual Estimate --<br/>Approach --<br/>Data --<br/>Adjustments --<br/>Presentation --<br/>Square Foot Estimating --<br/>Approach --<br/>Data --<br/>Adjustments --<br/>Presentation --<br/>Residential Estimating --<br/>Approach --<br/>Example Residential Estimate --<br/>Conclusion --<br/>ch. 6 Assemblies Estimating --<br/>Introduction --<br/>What is an Assembly? --<br/>Approach --<br/>Compilation and Adjustment --<br/>Presentation --<br/>Conclusion --<br/>ch. 7 Detailed Estimating --<br/>Introduction --<br/>Quantity Takeoff --<br/>Organization --<br/>Labor, Material, and Equipment --<br/>Measuring Quantities --<br/>Unit Pricing --<br/>Pricing Sources --<br/>Material Costs --<br/>Labor Costs --<br/>Equipment Costs --<br/>Estimate Setup --<br/>Format --<br/>Overhead --<br/>Profit --<br/>Conclusion --<br/>SECTION THREE SCHEDULING Ch. 8 Scheduling Fundamentals --<br/>Introduction --<br/>Schedule Definition --<br/>History of Scheduling --<br/>When to Schedule --<br/>Preconstruction Stage --<br/>Construction Stage --<br/>Postconstruction Stage --<br/>Scheduling Methods --<br/>Bar (Gantt) Chart Schedules --<br/>Linear Balance, Network-Based Bar Chart, and Matrix Schedules --<br/>Network Schedules --<br/>Conclusion --<br/>ch. 9 Network Construction --<br/>Introduction --<br/>Network Definition --<br/>Why Network Schedules? --<br/>The Project Planning Process --<br/>Project Investigation --<br/>Activity Definition --<br/>The Network Diagram --<br/>Network Notation --<br/>Network Presentation --<br/>Conclusion --<br/>ch. 10 Activity Duration and Network Calculations --<br/>Introduction --<br/>Durations --<br/>Scheduling Calculations --<br/>Node Notation --<br/>Forward Pass Calculations --<br/>Backward Pass Calculations --<br/>Float Calculations --<br/>Critical Path --<br/>Conclusion --<br/>SECTION FOUR PROJECT CONTROL --<br/>ch. 11 Fundamentals of Project Control --<br/>Introduction --<br/>Basic Control Theory --<br/>Project Control Objectives Project Control Cycle --<br/>Project Team Responsibilities --<br/>Owner --<br/>Designer --<br/>Construction Manager --<br/>Contractor --<br/>Cost Engineering --<br/>Cost and Schedule Performance --<br/>Variance Example --<br/>Conclusion --<br/>ch. 12 Cost, Schedule, and Resource Control --<br/>Introduction --<br/>What Are Resources? --<br/>Labor --<br/>Equipment --<br/>Space --<br/>Cash --<br/>Why Manage Resources? --<br/>Optimum Project Duration --<br/>Crashing --<br/>Optimum Project Duration Example --<br/>Optimization Conclusion --<br/>Labor and Equipment Studies --<br/>Cash Flow Analysis --<br/>Income Projection --<br/>Payment Projection --<br/>Cash Flow Analysis Conclusion --<br/>Conclusion --<br/>ch. 13 Updating the Project: Control in Practice --<br/>Introduction --<br/>Control Baselines --<br/>Cost Baseline --<br/>Time Baseline --<br/>Baseline Summary --<br/>Measuring Project Completion Status --<br/>Units Completed --<br/>Incremental Milestone --<br/>Cost Ratio --<br/>Other Methods --<br/>Material Cost and Schedule Control --<br/>Labor and Equipment Control --<br/>Project Documentation Process --<br/>Documentation --<br/>Project Coordination --<br/>Trending, Forecasting, and Reporting --<br/>Conclusion.
520 ## - SUMMARY, ETC.
Summary, etc Managing the Construction Process: Estimating, Scheduling, and Project Control, Fourth Edition, covers all areas of the Construction Management industry―with a balanced focus on both theory and practicality. Helping students gain a working knowledge of the whole Building Industry, this text provides the technical skills required to manage a construction project from conception through occupancy. Emphasizing current industry practices, it makes a useful reference for the construction professional.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Building
General subdivision Superintendence.
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 7
b cbc
c orignew
d 1
e ecip
f 20
g y-gencatlg
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Books
Holdings
Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Acquisition method Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
  Dewey Decimal Classification     Faculty of Engineering & Technology (General) Main library Main library B8 18/02/2015 Baccah 1080.00 Purchase   690 G.F.M 00012398 19/02/2025 18/02/2015 Books