000 03291nam a22002777i 4500
999 _c5950
_d5950
005 20200924110456.0
008 120502s2001 njua|||| b 001 0 eng d
020 _a0130661651
020 _a9780132578240
040 _aEG-NcFUE
_beng
_dEG-NcFUE
_erda
082 _a697.4
_bB
_223
245 0 0 _aBoilermaking.
_nlevel 3 :
_btrainee guide /
_cNCCER.
264 1 _aUpper Saddle River, N.J. :
_bPrentice Hall,
_c[2001]
264 4 _c©2001
300 _a1 volume (various pagings) :
_billustrations (some col.) ;
_c28 cm.
336 _2rdacontent
_atext
_btxt
337 _2rdamedia
_aunmediated
_bn
338 _2rdacarrier
_avolume
_bnc
504 _aIncludes bibliographical references and index.
505 0 _a(Total Level Hours: 167.5) 29103-09 Plasma Arc Cutting (PAC ) (10 Hours) Explains plasma arc cutting equipment and safe work area preparation. Identifies correct amperage settings, gas pressures, and flow rates. Covers plasma arc cutting methods for piercing, slotting, squaring, and beveling metals. Explains how to store equipment and clean the work area. 34301-11 Boiler Pressure Components(25 Hours) Describes the pressure components of a boiler system and their locations. Explains the procedures required to repair pressure components of a boiler. 34302-11 Boiler Nonpressure Components (15 Hours) Describes the nonpressure components of a boiler system and their locations. Explains the procedures required to repair pressure components of a boiler. 34303-11 Boiler Auxiliaries (25 Hours) Describes the air flow systems within a boiler system. Explains the different fuels used to fire boiler system furnaces. Describes ash removal systems and the equipment used to protect the environment. Covers the feed water system into a boiler and the blow down from a boiler system. 34304-11 BRIL (Brick, Refractory, Insulation, and Lagging) (5 Hours) Describes the various types of BRIL and explains their functions. Also addresses the hazards associated with BRIL. 34305-11 Advanced Tube Work (20 Hours) Explains the methods used to identify problem tubes and the methods used to extract them. Also describes the methods used for replacing and plugging tubes. 34306-11 Testing Piping Systems and Equipment (20 Hours) Lists pretest requirements for boiler system piping systems and equipment. Describes service and flow tests, head pressure tests, and hydrostatic tests performed on boiler system piping systems and equipment. 34307-11 Rigging (22.5 Hours) Describes common rigging hardware and equipment and how to inspect it. Identifies special rigging equipment. Covers the knots used in rigging and the hand signals used to communicate with crane operators. Describes basic rigging and crane safety procedures. Explains how to balance loads. 34308-11 Towers and Exchangers (25 Hours) Explains the basic distillation process. Identifies various types of towers and their components. Explains the function of various types of towers. Identifies various types of exchangers and their components. Explains exchanger functions.
520 _aNational Center for Construction Education and Research
650 0 _aBoilers
_xDesign and construction.
_928104
710 2 _aNational Center for Construction Education and Research (U.S.)
_928105
942 _cBK
_2ddc